Your search has returned these results:
BARCELONA NOV.20.2023
Controlling jitter in E1 and T1 lines is required for maintaining the reliability, accuracy, and quality of digital communication ensuring proper synchronization, data integrity, and performance in timing, voice and data applications.
BARCELONA NOV.17.2023
One-Way Delay test is important for verifying IEEE C37.94-compliant teleprotection systems because it directly assesses critical aspects such as timing, fault response, coordination, compliance with standards, and overall network reliability.
BARCELONANOV.17.2023
Round Trip Delay test over C37.94 is critical in teleprotection applications, where timely and accurate message communication is essential for the proper operation of protective relays and the quality of the power service.
BARCELONA NOV.17.2023
This test involves introducing simulated disturbances into the C37.94 channel to assess how the teleprotection can handle adverse conditions as it can be subject to signal distortion, noise, interference, and other that can affect its reliability.
BARCELONA NOV.17.2023
The Through Mode test is performed to ensure that the communication equipment correctly supports the C37.94 standard, allowing data to pass through without being processed; the xGenius or Zeus tester verifies that this functionality works correctly.
MIAMI 09.01.22
Protection schemes, such as C37.94, have the objective of keeping the Power System stable and isolated. For correct function the control of latency, latency variations and asymmetry is fundamental.